Built in Austin, TX  ·  Run on real projects
Issue 01
Q2 2026
A General Contractor's Software, Built by a General Contractor

Your construction software stack costs $50,000 a year.
None of it talks.

One platform replaces all six — PM, scheduler, daily logs, drawing markup, bidding, estimating. 30+ AI modules built in. $1,667/mo flat. Built by a working GC who got tired of paying the renewal.

Start a 14-day trial Watch the 90-second demo
· the product ·

This is what one platform
actually looks like.

Every project, every sub, every dollar — on one screen. Skim it, work it, hand it to a PM and they get it.

app.apexos360.com/projects/dashboard
ApexOS360 active projects dashboard — list view with margins, progress, and financial breakdown
Letter from the Builder

I run a GC out of Austin — multifamily, commercial, and tenant improvements across Texas and Colorado. As the owner of the company, I needed two things at the same time: tools my PMs would actually use on the jobsite, and real-time visibility into the financial pulse of every project I had running — without waiting on a month-end report from my accounting system to tell me what already happened.

Five years ago, I was paying enterprise software prices for a platform whose customer care team only called once a year — at renewal time. My PMs were stitching together four platforms to do one job. My controller was rebuilding the WIP in a spreadsheet every Friday. I was running a multi-million-dollar company on lagging numbers.

So I stopped waiting for someone to fix it. I built what we needed.

Every feature in this platform was forged on an active project, tested by my own team, and refined under the pressure of real deadlines, real budgets, and real subs. The financials, the schedules, the daily logs, the pay apps, the bid board, the AR — they all live in one system. I don't read a WIP report from last month. I open the WIP. Same for cash flow. Same for change orders. Same for the sales pipeline. Everything, in one place, right now.

Now I'm opening it up to the GCs who've been stuck in the same trap I was — paying too much for software that does too little, or running their construction and their finance on separate systems that don't talk. You shouldn't have to choose between bloat and breakdown. And you shouldn't have to wait on a report to know where your business stands.

This was built for the people who put steel in the ground, manage the schedule, sign the contracts, watch the margin, and answer to the owner when something goes sideways. It is a construction platform. It is a financial platform. It is the same platform.

If you build for a living, this was built for you.

— Founder  ·  ApexOS360  ·  Austin, TX
A Tour of the Toolkit

Everything a mid-size GC needs.
One tool. One bill.

Feature ApexOS360 Procore Sage 300 CRE
AI schedule builder (auto-generates CPM with predecessors)✓Limited—
AI Business Intelligence Briefing (full-portfolio executive analysis)✓——
AI invoice intake (PDF → AP queue → QuickBooks)✓Add-on—
Contract templates with token fill (AIA, custom)✓Add-on—
GC Shield contract risk analysis (AI-powered legal review)✓——
Schedule Analytics (SPI, float distribution, CPM quality grade)✓Add-on—
Weather delay claim documentation (AIA/ConsensusDocs ready)✓——
Owner project portal (client-facing read-only access)✓Limited—
Free subcontractor portal (no signup, magic links)✓Subs pay—
AIA G702 / G703 native pay applications✓✓✓
Native job cost accounting + WIP✓Add-on✓
QuickBooks Online sync✓✓Sage-only
Daily logs with AI photo extraction✓✓—
Bid board with sub coverage tracking✓✓—
Workflow automation (custom approval chains)✓✓Limited
Pricing modelFlat per companyVolume-basedPer-user + per-module
Cost — mid-size GC, 20 active projects$1,667/mo flat$2K–$10K+/mo$800–$2,500/mo
· ai, embedded ·

An AI that reads
your whole business.

One click on the dashboard. AI ingests every project, contract, invoice, bid, and risk in the portfolio — then hands back an executive briefing with critical alerts, financial diagnosis, and a prioritized action list. Export to PDF and walk it into your bank. The data entry your PMs hate is gone too — drop in a sub invoice, AI codes it in two seconds.

app.apexos360.com/ai/platform-briefing
ApexOS360 Full Platform Intelligence Briefing — executive summary with critical alerts, insurance crisis warning, and prioritized recommendations across the portfolio
The Stack You're Already Paying For

Seven tools.
One bill.

Most mid-size GCs are paying for six to eight different platforms that don't talk to each other. Here's the math.

Six tools consolidate into one ApexOS360 platform
What you're paying for Typical annual cost The problem Covered by ApexOS360
PM platform (Procore, etc.)$15,000–$50,000/yrVolume-based pricing climbs every renewal✓ Full PM, financials, document control
Scheduling software (MS Project or P6)$500–$15,000/yrMost PM platforms have no real CPM scheduling✓ Built-in CPM + AI Schedule Builder
Site documentation app (CompanyCam, etc.)$1,600–$5,000/yrPer-user pricing adds up across the field team✓ Field Ops + AI photo descriptions
Bid management (BuildingConnected)$3,600–$10,000/yrOpaque pricing, limited integration✓ Bid Board + Prequal Portal
Drawing markup (Bluebeam Revu)$2,000–$6,500/yr$260–$440 per user, per year✓ Planroom + Document Control
Daily reporting (Raken, etc.)$1,400–$4,500/yrStandalone, no project integration✓ Daily Logs + Field Ops + AI
Estimating (PlanSwift, etc.)$1,750–$5,000/yrSeparate subscription, no budget sync✓ Estimating + Cost Catalog + AI Takeoff
Your current annual stack: $25,000–$96,000+ /yr ApexOS360 Pro: $1,667 /mo flat
$15,000–$50,000+
Typical annual savings for a mid-size GC — before counting the AI tools none of those platforms have. Heavier stacks (Procore + P6 + full add-ons) save more.

Pricing ranges reflect published rates and customer-reported figures from 2026 industry data (G2, Capterra, vendor pages). Actual cost depends on team size, modules, and contract terms. Procore and BuildingConnected do not publish list pricing; ranges are based on customer-reported quotes.

Schedule Intelligence  ·  The P6 + SmartPM Replacement

A schedule that grades
itself.

It’s not a Gantt chart with extra steps. Every project gets a CPM quality grade, an SPI score, float distribution, near-critical watchlist, baseline vs. current comparison, and trade performance — the kind of analytics owners pay outside scheduling consultants $10K/month to produce. Built in.

app.apexos360.com/projects/[project]/schedule/analytics
ApexOS360 Schedule Analytics — 87 activities, SPI 0.87, B+ quality grade, +52d slip prediction, CPM structure validation
· weather claim support ·

Documented justification, every day.

Daily logs roll up into a weather impact analysis. When a high-severity day overlaps the critical path, the platform writes the delay claim language for you — cited to specific activities, with severity, crew impact, and CP exposure. AIA and ConsensusDocs ready.

Planned vs Actual S-Curve with Weather Impact Analytics and auto-generated Weather Delay Claim Support language
· baseline vs current ·

Slip, recovery, and where to look first.

Schedule comparison flags every slipped and accelerated activity against baseline. Trade performance scorecards. Float distribution with a near-critical watchlist that surfaces the activities one bad week away from becoming critical path.

Schedule baseline vs current comparison with trade performance percentages, float distribution chart, and near-critical watchlist
Subcontractor Portal  ·  Free For Subs

The portal your subs
will actually use.

The big platforms charge your subs to access your projects. We don't. Magic-link access, no signup, no password. Open the email, click, you're in.

· what your sub sees ·

Pay app submitted. Lien waiver signed. In one place.

No signup screen. No password reset email. No “I forgot which platform you’re on.” Tap the magic link, you’re in. AIA G702/G703 pay app, retention tracking, and conditional + unconditional lien waivers with digital signing — the whole draw cycle on one page.

The friction is the reason your subs ignored the last portal. We removed it.

See the price →
portal.apexos360.com/sub/pay-app
Subcontractor portal — pay application history with status badges plus conditional and unconditional lien waivers with digital signing

Lien waiver tracking

Conditional and unconditional waivers logged per pay app. Automatic reminders before each draw. State-specific templates included — Texas, California, Florida, and more.

AIA G702 / G703 pay app submission

Subs submit their pay applications directly through the portal — SOV by line item, current period, stored materials, retention. Your team reviews and approves in one place.

Retention release

Per-invoice retention percentages, cumulative tracking, and final retention release workflow with the lien waiver log already in place.

Insurance certificate management

Subs upload COIs and W-9s to their portal. Expiration tracking with auto-reminders. No more chasing certs the week of mobilization.

Bid invitations + RFI replies

Send bid invites to your sub network, get coverage tracking and escalating reminders. Subs reply to RFIs through the same portal — no email thread archeology.

Sub default + backcharge tracking

Backcharges, sub default events, and warranty issues all logged against the right contract. Pulls into your WIP and final closeout automatically.

Owner Portal  ·  Client-Facing Transparency

Your owner sees
what they need to see.

Read-only project access for your owners and clients. Contract progress, billed-to-date, remaining balance — on every project they’ve hired you for. They stop emailing for updates. You stop sending them.

· what your owner sees ·

Every project, every dollar — their view, on demand.

A clean, branded project portal — one login per owner across all their active jobs with you. Contract value, billed amount, remaining balance, and progress percentage on each. Magic-link entry, no signup required, no app to download.

Stop being the bottleneck on “hey, where are we on that project?” emails. The data is already there — let them see it.

portal.apexos360.com/owner/projects
ApexOS360 Owner Portal — read-only project view with contract progress percentages, billed amounts, and remaining balances per project
· the tour ·

A look around
the platform.

Two of the screens your team will live in. All on one login.

ApexOS360 Interactive Gantt — multi-phase CPM schedule with critical path
· scheduling ·
CPM scheduling, with AI that builds it for you.

Real CPM with phases, predecessors, and a critical path you can actually see. AI Build Schedule generates the network from scope; edit by hand when you need to. Replaces P6 or MS Project entirely.

ApexOS360 Reports Center — 11 portfolio reports plus the WIP cost-to-cost schedule with earned value and over/under billing
· financials ·
Budget, WIP, change orders, cash flow. Linked.

Eleven portfolio reports out of the box — WIP cost-to-cost, AR aging, retention, job cost variance, change order velocity, sub scorecards. AI Analyze on every report. QuickBooks Online sync.

Pricing  ·  Flat Per Tenant

No per-seat counting.
No project metering.

One flat price per company. Your whole team, your whole pipeline. No per-seat surcharges. No project metering.

Starter
Solo GC or small operator, 1–3 active projects
$750/mo
flat — billed monthly
  • Up to 3 active projects
  • Up to 10 users (PMs, supers, admin)
  • Full 30+ AI tool suite — no monthly limits
  • AIA G702 / G703 pay applications
  • Free unlimited subcontractor portal
  • CPM scheduling + AI Schedule Builder
  • Daily logs + AI photo descriptions
  • Estimating + AI Takeoff + Cost Catalog
  • QuickBooks Online sync
  • Email support, 24-hour response
Start 14-day trial
Credit card required. Cancel anytime.
Enterprise
Multi-office GC, $50M+ annual volume, or owner-rep
$2,333/mo
or $7,000 quarterly — $28,000/yr, you choose
  • Everything in Pro, plus:
  • Custom AI training on your bidding history + contract library — the AI learns your specific pricing, sub network, and legal patterns
  • API access + custom integrations (ERP, HR, BI tools)
  • SSO (SAML / Okta / Azure AD)
  • Custom roles & granular permissions
  • Custom contract templates (your legal library)
  • Full owner / lender guest accounts
  • White-label / partner-tenant option
  • Multi-company admin + full audit trail
  • Dedicated success manager
  • Quarterly business review
  • 1-hour SLA + white-glove 4-hour onboarding
  • SOC 2 documentation package
Start 14-day trial
Or contact us for a demo.
90-second demo

From scope to signed contract
in less time than a coffee.

Watch us build a real schedule, code an AP invoice, and generate a subcontract — start to finish, no edits.

See the pricing →
Five Things You're Probably Wondering

Honest answers.

We already have a PM platform. Why switch?
The big platforms work. The question is whether you want to keep paying for six different tools that don't talk to each other. Most mid-size GCs we talk to are paying $25,000–$96,000/yr across PM, scheduling, drawing markup, daily logs, bid management, and estimating tools — and that's before counting the AI features none of them ship. ApexOS360 Pro is $1,667/mo flat ($20,000/yr) and replaces all of it, with 30+ AI tools embedded throughout the workflow. Try us 30 days. If you don't see ROI, we refund every dollar.
Is AI safe for legal contracts?
Every contract template comes from AIA standards or our platform library, vetted by construction lawyers. The AI fills in YOUR data — names, dates, amounts — into a fixed legal framework. It does not write legal language from scratch. Every contract still goes through your standard legal review before signing. AI does the data entry; you do the judgment.
How is my data isolated from other tenants?
Every tenant — your projects, subs, financials — is isolated at the database level via PostgreSQL row-level security. The GC who built this platform runs on it alongside you. The team has zero access to your data. We're working toward SOC 2 in 2026.
My subs won't use a portal.
Most won't because the big platforms charge them to access your projects. Ours is free for subs and uses magic links — no signup, no password, click the email and you're in. Our own subs use it daily on every project. Yours will too once friction is removed.
What if I need to leave?
You can cancel anytime, and you can export all your data — projects, schedules, invoices, contracts — as CSV or JSON. We'll never hold your data hostage. Within 30 days of signing up, we'll refund 100% no questions asked. After that, prorated.
Can my owner / lender see project status?
Yes. Pro tier includes read-only owner/lender access to project dashboards. Enterprise tier includes full guest accounts with project-scoped permissions. White-label branding available for Enterprise + partner-tenant model.

Built by a builder.
Priced like you'd want it priced.

Join the GCs who consolidated their software stack and stopped paying six vendors.

Start your trial → Email us